{"id":237,"date":"2026-11-21T22:08:28","date_gmt":"2026-11-22T06:08:28","guid":{"rendered":"https:\/\/www.globalcodeconsulting.com\/articles\/?p=237"},"modified":"2026-11-22T22:01:25","modified_gmt":"2026-11-23T06:01:25","slug":"aging-in-place-crc-r328","status":"publish","type":"post","link":"https:\/\/www.globalcodeconsulting.com\/articles\/aging-in-place-crc-r328\/","title":{"rendered":"Aging-in-Place Code in California: CRC R328 Explained"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><em>The four things every new California house needs so the owner can stay in it longer &#8211; and the one that is easiest to miss before the drywall goes up.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Last verified: November 21, 2026<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The short answer.<\/strong> Since January 1, 2023, a newly built house in California has to be framed and wired with a few aging-in-place basics: backing in the walls for future grab bars in at least one bathroom, switches and outlets at reachable heights, a doorbell that is not mounted too high, and (since July 1, 2024) at least one bathroom and one bedroom with a 32-inch clear door opening. In the 2022 code this was Section R327. In the 2025 California Residential Code, in effect since January 1, 2026, the same subject is Section R328.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Nobody has to install a grab bar. The code only makes sure that one can be added later without opening the wall.<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_90 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title ez-toc-toggle\" style=\"cursor:pointer\">Aging-in-Place Code in California: CRC R328 Explained<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.globalcodeconsulting.com\/articles\/aging-in-place-crc-r328\/#Where_this_came_from\" >Where this came from<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.globalcodeconsulting.com\/articles\/aging-in-place-crc-r328\/#The_timeline\" >The timeline<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.globalcodeconsulting.com\/articles\/aging-in-place-crc-r328\/#Which_book_applies_to_your_job\" >Which book applies to your job<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.globalcodeconsulting.com\/articles\/aging-in-place-crc-r328\/#Who_it_applies_to\" >Who it applies to<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.globalcodeconsulting.com\/articles\/aging-in-place-crc-r328\/#The_four_requirements_in_plain_words\" >The four requirements, in plain words<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.globalcodeconsulting.com\/articles\/aging-in-place-crc-r328\/#1_Backing_for_grab_bars_CRC_R32811\" >1. Backing for grab bars (CRC R328.1.1)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.globalcodeconsulting.com\/articles\/aging-in-place-crc-r328\/#2_Switches_outlets_and_controls_within_reach_CRC_R32812\" >2. Switches, outlets and controls within reach (CRC R328.1.2)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.globalcodeconsulting.com\/articles\/aging-in-place-crc-r328\/#3_One_bathroom_door_and_one_bedroom_door_at_32_inches_clear_CRC_R32813\" >3. One bathroom door and one bedroom door at 32 inches clear (CRC R328.1.3)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.globalcodeconsulting.com\/articles\/aging-in-place-crc-r328\/#4_The_doorbell_CRC_R32814\" >4. The doorbell (CRC R328.1.4)<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.globalcodeconsulting.com\/articles\/aging-in-place-crc-r328\/#What_usually_gets_missed\" >What usually gets missed<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.globalcodeconsulting.com\/articles\/aging-in-place-crc-r328\/#What_can_vary\" >What can vary<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.globalcodeconsulting.com\/articles\/aging-in-place-crc-r328\/#FAQ\" >FAQ<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/www.globalcodeconsulting.com\/articles\/aging-in-place-crc-r328\/#Disclaimer\" >Disclaimer<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Where_this_came_from\"><\/span>Where this came from<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The rule started as a bill, not as a model code change. Senate Bill 280 was signed on October 8, 2019. It added Section 17922.15 to the Health and Safety Code, which told the state housing department (HCD) to look at changes to the California Residential Code that would help people stay in their homes as they age.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The law kept the list short on purpose. HCD could look at only three things:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Where doorbells, light switches and heating and cooling controls are placed,<\/li>\n\n\n\n<li>Backing for grab bars to be added later in one or more bathrooms, and<\/li>\n\n\n\n<li>A 32-inch clear width for one bathroom door and one bedroom door on the ground floor.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">HCD could propose a change only if it did not add much to the cost of building. For the door width, the law also asked HCD to say whether the start date should be pushed back to give designers and builders time.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">HCD wrote the proposal during the 2021 code cycle. The reasoning it gave: backing is cheap when the walls are open and expensive after, and the pieces can often be cut from scrap lumber already on the job.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"The_timeline\"><\/span>The timeline<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>October 8, 2019<\/strong> &#8211; SB 280 signed.<\/li>\n\n\n\n<li><strong>2021<\/strong> &#8211; HCD proposes the new section in the triennial code cycle.<\/li>\n\n\n\n<li><strong>January 1, 2023<\/strong> &#8211; the 2022 California Residential Code takes effect with the new Section R327: grab bar backing, switch and outlet heights, and the doorbell height apply from this date.<\/li>\n\n\n\n<li><strong>July 1, 2024<\/strong> &#8211; the 32-inch interior door rule starts. It was held back on purpose to give the industry time.<\/li>\n\n\n\n<li><strong>January 1, 2026<\/strong> &#8211; the 2025 California Residential Code takes effect. Chapter 3 was reorganized and the section is now <strong>R328<\/strong>. (If your plan notes still say R327, they point at the old book. And if a solar or battery sheet still cites R328 for energy storage, that section moved too &#8211; it is R330 now.)<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Which_book_applies_to_your_job\"><\/span>Which book applies to your job<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The code that applies is the one in effect on the day the building permit application was <strong>submitted<\/strong> &#8211; not the day the plans were approved, and not the day the house is built. That comes from Section 1.1.9 of the code and from Health and Safety Code Section 18938.5 behind it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">So a house whose permit application went in under the 2022 code is still an R327 job, even when it is framed in 2026. On site, the code cycle shown on the stamped plans tells you which book you are in.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Two things to watch:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>How the date is set is local.<\/strong> Each building department decides what counts as a submitted application. If your project sits across the change, ask before you order doors.<\/li>\n\n\n\n<li><strong>An expired permit starts over.<\/strong> If a permit expires and a new one is needed, expect the current code on the new one.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Who_it_applies_to\"><\/span>Who it applies to<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The section opens with three words that decide everything: <strong>newly constructed dwellings<\/strong>. That means new houses, duplexes and townhouses built under the residential code, and it includes a new detached ADU. It lists only two exceptions: covered multifamily housing built to Chapter 11A of the California Building Code, and public housing built to Chapter 11B, which have their own accessibility rules.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">By the text it does not reach a remodel or an addition to an existing house. ADUs attached as additions, garage conversions and junior ADUs are where building departments read it differently. That question gets its own article, coming next.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"The_four_requirements_in_plain_words\"><\/span>The four requirements, in plain words<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1_Backing_for_grab_bars_CRC_R32811\"><\/span>1. Backing for grab bars (CRC R328.1.1)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">At least one bathroom on the entry level gets backing in the walls so grab bars can be mounted later. If the entry level has no bathroom, one on the second or third floor has to comply instead.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"709\" height=\"423\" src=\"https:\/\/www.globalcodeconsulting.com\/articles\/wp-content\/uploads\/2026\/11\/A-grab-bar-reinforcement-no-letter.png\" alt=\"\" class=\"wp-image-243\" style=\"width:545px;height:auto\" srcset=\"https:\/\/www.globalcodeconsulting.com\/articles\/wp-content\/uploads\/2026\/11\/A-grab-bar-reinforcement-no-letter.png 709w, https:\/\/www.globalcodeconsulting.com\/articles\/wp-content\/uploads\/2026\/11\/A-grab-bar-reinforcement-no-letter-300x179.png 300w\" sizes=\"auto, (max-width: 709px) 100vw, 709px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">What the backing has to be:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>solid lumber no smaller than a 2&#215;8 (1-1\/2 by 7-1\/4 inches actual) &#8211; or another material the building department approves that gives the same height and load capacity,<\/li>\n\n\n\n<li>set flush with the face of the wall framing,<\/li>\n\n\n\n<li>located between 32 inches and 39-1\/4 inches above the finished floor.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Where it goes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>At the toilet:<\/strong> on both side walls of the fixture, or on one side wall and the back wall.<\/li>\n\n\n\n<li><strong>At a bathtub or tub \/ shower combination:<\/strong> continuous on each end wall and on the back wall, plus a second, lower run on the back wall with its bottom edge no more than 6 inches above the tub rim.<\/li>\n\n\n\n<li><strong>At a shower:<\/strong> continuous wherever the shower has framed walls.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The exceptions worth knowing:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Toilet with no usable side wall:<\/strong> the bathroom can instead be set up for a floor-mounted, fold-away or similar bar, as approved by the building department.<\/li>\n\n\n\n<li><strong>Factory units:<\/strong> no wall backing is needed behind a prefabricated shower enclosure or tub wall panel that comes with grab bars built in, or with factory-installed reinforcement for them.<\/li>\n\n\n\n<li><strong>Showers and tubs that cannot take backing:<\/strong> an enclosure that does not allow it, a tub with no surrounding walls, or wall panels that do not allow it are still permitted &#8211; but only with reinforcement for floor-mounted bars or another method the building department approves. That approval is the part people skip.<\/li>\n\n\n\n<li><strong>Slab floors:<\/strong> floor reinforcement is not required for a tub or toilet set on a concrete slab.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Write down where the backing is (CRC R328.1.1.1).<\/strong> The location of the backing has to be recorded &#8211; notes, drawings or both &#8211; and placed in the home&#8217;s operation and maintenance manual, the same manual CALGreen already requires at final. The point is simple: ten years later, the owner or their installer can find the wood without a stud finder and a prayer.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2_Switches_outlets_and_controls_within_reach_CRC_R32812\"><\/span>2. Switches, outlets and controls within reach (CRC R328.1.2)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Outlets, switches and controls meant to be used by the people living there go in a reachable band:<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"588\" height=\"413\" src=\"https:\/\/www.globalcodeconsulting.com\/articles\/wp-content\/uploads\/2026\/11\/B-outlet-switch-control-heights-no-letter-edited.png\" alt=\"\" class=\"wp-image-242\" style=\"width:443px;height:auto\" srcset=\"https:\/\/www.globalcodeconsulting.com\/articles\/wp-content\/uploads\/2026\/11\/B-outlet-switch-control-heights-no-letter-edited.png 588w, https:\/\/www.globalcodeconsulting.com\/articles\/wp-content\/uploads\/2026\/11\/B-outlet-switch-control-heights-no-letter-edited-300x211.png 300w\" sizes=\"auto, (max-width: 588px) 100vw, 588px\" \/><\/figure>\n<\/div>\n\n\n<ul class=\"wp-block-list\">\n<li>no higher than 48 inches, measured to the <strong>top<\/strong> of the box,<\/li>\n\n\n\n<li>no lower than 15 inches, measured to the <strong>bottom<\/strong> of the box,<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">both above the finished floor. Heating and cooling controls are included by name.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Not covered by the height band: dedicated outlets, floor outlets, controls mounted on ceiling fans and ceiling lights, and controls on appliances. One more practical exception: where the electrical code requires an outlet on a wall space with less than 15 inches between the floor and a built-in feature above it, such as a low window, that outlet can sit lower.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3_One_bathroom_door_and_one_bedroom_door_at_32_inches_clear_CRC_R32813\"><\/span>3. One bathroom door and one bedroom door at 32 inches clear (CRC R328.1.3)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">At least one bathroom and one bedroom on the entry level need a doorway with a <strong>net clear opening<\/strong> of 32 inches or more. The measurement is taken with the door open 90 degrees.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If a two- or three-story house has no bathroom or bedroom on the entry level, the bathroom or bedroom on the second or third floor can be the one that complies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Watch out: net clear is the code number, not the door size.<\/strong> With the door open 90 degrees, the door itself is still standing in the opening. So:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Add the thickness of the door being installed.<\/strong> On a standard hinge the open door takes its own thickness out of the opening, and the stop takes a little more.<\/li>\n\n\n\n<li><strong>Allow for the type of hinge.<\/strong> Different hinges leave the open door in different places. Check the hinge that is actually going on the job, not the one you are used to.<\/li>\n\n\n\n<li><strong>Check the rough opening at framing.<\/strong> I look at the rough width then, and I make sure the contractor knows to check what the finished frame will actually leave clear. By the time the door is hung it is too late to find out.<\/li>\n\n\n\n<li><strong>Check the bathroom door against the vanity, sooner rather than later.<\/strong> A wider rough opening has to go somewhere. If the plans did not account for it, the finished door frame can land where the vanity was supposed to be. The usual way out is a pedestal sink or something like it, and the owner loses the cabinet space. It is an unfortunate thing to discover after framing.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"4_The_doorbell_CRC_R32814\"><\/span>4. The doorbell (CRC R328.1.4)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">If a doorbell is installed, the button can be no higher than 48 inches above the exterior floor or landing, measured to the <strong>top<\/strong> of the button assembly. If a doorbell with a camera or other built-in features has to go higher, a plain button at 48 inches or lower is needed as well.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"840\" height=\"941\" src=\"https:\/\/www.globalcodeconsulting.com\/articles\/wp-content\/uploads\/2026\/11\/01-walk-in-shower.png\" alt=\"\" class=\"wp-image-247\" style=\"aspect-ratio:0.8926763093031699;width:342px;height:auto\" srcset=\"https:\/\/www.globalcodeconsulting.com\/articles\/wp-content\/uploads\/2026\/11\/01-walk-in-shower.png 840w, https:\/\/www.globalcodeconsulting.com\/articles\/wp-content\/uploads\/2026\/11\/01-walk-in-shower-268x300.png 268w, https:\/\/www.globalcodeconsulting.com\/articles\/wp-content\/uploads\/2026\/11\/01-walk-in-shower-768x860.png 768w\" sizes=\"auto, (max-width: 840px) 100vw, 840px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_usually_gets_missed\"><\/span>What usually gets missed<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Every item on this list is one I have written up, and more than once.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>The plans say nothing.<\/strong> No bathroom is named as the aging-in-place bathroom and no backing is drawn. The framer then has nothing to build from.<\/li>\n\n\n\n<li><strong>Backing at the wrong height or set back from the face.<\/strong> The band is 32 to 39-1\/4 inches above the <em>finished<\/em> floor, not the subfloor. Tile, a mud bed or a curbless shower pan changes the number.<\/li>\n\n\n\n<li><strong>The lower tub backing is forgotten.<\/strong> The run within 6 inches of the tub rim is separate from the main band.<\/li>\n\n\n\n<li><strong>Only one toilet wall is backed.<\/strong> It takes both side walls, or one side wall plus the back wall.<\/li>\n\n\n\n<li><strong>A freestanding tub or frameless shower with no plan for bars.<\/strong> The exception needs an approved alternate, and nobody asked.<\/li>\n\n\n\n<li><strong>Backing cut through.<\/strong> A vent, a valve body or a recessed niche lands in the same stud bay and the backing gets notched or left out.<\/li>\n\n\n\n<li><strong>The measurement taken to the wrong point.<\/strong> Outlets are measured to the bottom of the box at the low end and the top of the box at the high end &#8211; not to the center.<\/li>\n\n\n\n<li><strong>The video doorbell.<\/strong> It gets mounted at camera height with no second button.<\/li>\n\n\n\n<li><strong>The door.<\/strong> The right door size is on the schedule, but the net clear opening comes up short once it is hung, because nobody added the door&#8217;s thickness or checked the hinge.<\/li>\n\n\n\n<li><strong>No record at final.<\/strong> The backing is in the wall but nothing went into the owner&#8217;s manual.<\/li>\n<\/ul>\n\n\n\n<!-- START ADVERTISER: Harfington from awin.com -->\n\n<div style=\"text-align:center;margin:1.5em 0;\">\n<p style=\"font-size:0.8em;margin:0 0 0.3em 0;\">Advertisement<\/p>\n<a rel=\"sponsored nofollow noopener\" target=\"_blank\" href=\"https:\/\/www.awin1.com\/cread.php?s=4485089&#038;v=96541&#038;q=519019&#038;r=2513715\"><img decoding=\"async\" src=\"https:\/\/www.awin1.com\/cshow.php?s=4485089&#038;v=96541&#038;q=519019&#038;r=2513715\" alt=\"Advertisement for Harfington (opens in a new tab)\" style=\"max-width:100%;height:auto;border:0;\"><\/a>\n<\/div>\n\n<!-- END ADVERTISER: Harfington from awin.com -->\n\n\n\n<p class=\"wp-block-paragraph\">Most plan sets carry this section as a general note, if at all, and a note does not tell the framer which wall, how long, or what is in the way. How to lay the backing out before framing, what to photograph, and what a miss costs to fix will be in a separate field tip, coming next.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_can_vary\"><\/span>What can vary<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>The code cycle.<\/strong> R327 (2022 book) or R328 (2025 book), depending on the date the permit application was submitted.<\/li>\n\n\n\n<li><strong>Local amendments.<\/strong> A city or county can adopt stricter rules; some have their own universal design ordinances.<\/li>\n\n\n\n<li><strong>The building department&#8217;s reading<\/strong> of the alternate grab bar provisions and of what counts as newly constructed.<\/li>\n\n\n\n<li><strong>The fixture and the manufacturer&#8217;s instructions,<\/strong> especially for prefabricated tub and shower units.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"FAQ\"><\/span>FAQ<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Do I have to install grab bars in a new house?<\/strong><br>No. The code asks for backing in the wall and a record of where it is, so bars can be added later.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Does this apply to my bathroom remodel?<\/strong><br>By the text, no. The section is written for newly constructed dwellings, and a remodel is work on an existing one. A city can adopt stricter local rules, so ask your building department. If the wall is open anyway, put the backing in &#8211; it costs almost nothing at that stage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Does it apply to my ADU?<\/strong><br>A new detached ADU: yes. Conversions, junior ADUs and attached ADUs depend on the project and the department.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Is R327 the same as R328?<\/strong><br>Yes. The requirements read the same in both books; only the number changed. R327 is the 2022 California Residential Code and R328 is the 2025 edition, in effect since January 1, 2026. (The door paragraph in the 2025 book even still carries its original July 1, 2024 start date.)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>My house is being built in 2026. Is it R327 or R328?<\/strong><br>It depends on when the building permit application was submitted, not on when the house is built. An application submitted while the 2022 code was in effect stays under R327. Your building department can tell you how it sets that date.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Can I use plywood instead of 2&#215;8 blocking?<\/strong><br>Only with approval. The code calls for solid lumber or another material approved by the building department, and the substitute has to give the same height and load capacity as a 2&#215;8. One example of a material that gets proposed is the flat metal backing made for steel-stud walls. For anything like that I ask for a written answer from the architect that names a suitable material (an RFI, a request for information, is the usual way to get one). Ask before you frame, not at inspection.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Does a 32-inch door meet the 32-inch rule?<\/strong><br>Not by itself. The rule is 32 inches of net clear opening with the door open 90 degrees. A 32-inch door does not give that once the door&#8217;s own thickness and the hinge are counted.<\/p>\n\n\n\n<!-- START ADVERTISER: Dongguan Dovoh Laser Instrument Co.,Ltd from awin.com -->\n\n<div style=\"text-align:center;margin:1.5em 0;\">\n<p style=\"font-size:0.8em;margin:0 0 0.3em 0;\">Advertisement<\/p>\n<a rel=\"sponsored nofollow noopener\" target=\"_blank\" href=\"https:\/\/www.awin1.com\/cread.php?s=4286836&#038;v=57741&#038;q=559539&#038;r=2513715\"><img decoding=\"async\" src=\"https:\/\/www.awin1.com\/cshow.php?s=4286836&#038;v=57741&#038;q=559539&#038;r=2513715\" alt=\"Advertisement for Dovoh laser levels (opens in a new tab)\" style=\"max-width:100%;height:auto;border:0;\"><\/a>\n<\/div>\n\n<!-- END ADVERTISER: Dongguan Dovoh Laser Instrument Co.,Ltd from awin.com -->\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Disclaimer\"><\/span>Disclaimer<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">This is general information, not legal or design advice, and not an official code interpretation. Requirements vary by jurisdiction, adopted code cycle and local amendment, and manufacturer instructions may control. Check with your local building department and the adopted code for your project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The four things every new California house needs so the owner can stay in it longer &#8211; and the one that is easiest to miss before the drywall goes up.<\/p>\n","protected":false},"author":2,"featured_media":249,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","footnotes":""},"categories":[39],"tags":[32,38,36,35,37,34,33],"class_list":["post-237","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-california-residential-code","tag-aging-in-place","tag-bathroom","tag-framing","tag-grab-bar-backing","tag-r327","tag-r328","tag-rough-inspection"],"_links":{"self":[{"href":"https:\/\/www.globalcodeconsulting.com\/articles\/wp-json\/wp\/v2\/posts\/237","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.globalcodeconsulting.com\/articles\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.globalcodeconsulting.com\/articles\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.globalcodeconsulting.com\/articles\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.globalcodeconsulting.com\/articles\/wp-json\/wp\/v2\/comments?post=237"}],"version-history":[{"count":5,"href":"https:\/\/www.globalcodeconsulting.com\/articles\/wp-json\/wp\/v2\/posts\/237\/revisions"}],"predecessor-version":[{"id":256,"href":"https:\/\/www.globalcodeconsulting.com\/articles\/wp-json\/wp\/v2\/posts\/237\/revisions\/256"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.globalcodeconsulting.com\/articles\/wp-json\/wp\/v2\/media\/249"}],"wp:attachment":[{"href":"https:\/\/www.globalcodeconsulting.com\/articles\/wp-json\/wp\/v2\/media?parent=237"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.globalcodeconsulting.com\/articles\/wp-json\/wp\/v2\/categories?post=237"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.globalcodeconsulting.com\/articles\/wp-json\/wp\/v2\/tags?post=237"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}